Project Description Part 1
File Number: 02/10-05-0001
Document: Project Description
Type: PDF
Size: 3 MB
Project Description Part 2
File Number: 02/10-05-0002
EISC Decision Letter Package April 2010
File Number: 02/10-05-0003
Document: Additional Information
Size: 901 KB
Developer reply to EISC Decision
File Number: 02/10-05-0004
Document: Other
Size: 300 KB
Decision Letter
File Number: 02/10-05-0005
Document: Decision Letter
Size: 17 KB
EISC Referral to EIRB
File Number: 02/10-05-0006
Size: 15 KB
Notice of referral to Proponent 2010-05-05
File Number: 02/10-05-0008
Document: Comment/Advice Letter
Size: 52 KB
Notice of referral to Joint Secretariat 2010-05-05
File Number: 02/10-05-0009
Size: 71 KB
Notice of referral to Government agencies
File Number: 02/10-05-0010
Size: 53 KB
PUBLIC NOTICE OF REFERRAL 2010-05-05
File Number: 02/10-05-0011
File Number: 02/10-05-0012
Size: 58 KB
Notice of referral to Minister of INAC and EC 2010-05-07
File Number: 02/10-05-0013
Size: 39 KB
Inuvik-Tuktoyaktuk Highway Developer Information Request 2010-05-28
File Number: 02/10-05-0014
Size: 33 KB
Information request Letter to Developer – 2010-06-04
File Number: 02/10-05-0015
Size: 103 KB
Letter to CEAA 2010-06-04
File Number: 02/10-05-0016
Size: 179 KB
Developer response letter to EIRB 2010-06-11
File Number: 02/10-05-0017
Size: 195 KB
Notice of Deadline Extension to Registered Participants 2010-06-15
File Number: 02/10-05-0018
Size: 62 KB
Letter from Minister Chuck Strahl 2010-06-29
File Number: 02/10-05-0019
Size: 188 KB
Letter from Minister Jim Prentice 2010-06-29
File Number: 02/10-05-0020
Size: 221 KB
Reply Letter from CEAA 2010-07-05
File Number: 02/10-05-0021
Size: 225 KB
Letter from DOT to Jim Prentice and Chuck Strahl 2010-08-04
File Number: 02/10-05-0022
Size: 441 KB
Letter to Honourable Ministers Prentice and Strahl 2010-08-04
File Number: 02/10-05-0023
Size: 44 KB
Review Schedule 2010-08-10
File Number: 02/10-05-0025
Size: 159 KB
EIS outline 2010-08-23
File Number: 02/10-05-0027
Size: 162 KB
August 23 Letter from Developer 2010-08-23
File Number: 02/10-05-0028
Size: 76 KB
Letter to Developer August 24 2010-08-24
File Number: 02/10-05-0029
Size: 60 KB
Review Schedule FINAL 2010-09-13
File Number: 02/10-05-0030
Size: 149 KB
14. Notice from CEAA to Gwich’In Tribal Council – June 14 2010 2008-06-14
File Number: 02/10-05-0031
Size: 67 KB
EIS ToR Notice of Release 2010-09-30
File Number: 02/10-05-0032
Size: 264 KB
EIS Terms of Reference 30Sept2010 2010-09-30
File Number: 02/10-05-0033
Size: 752 KB
ILA Response to EISB TOR 2010-10-29
File Number: 02/10-05-0035
Size: 156 KB
Community Scoping Sessions –Draft EIS Terms of Reference – Inuvik 2010-10-29
File Number: 02/10-05-0036
Size: 560 KB
Community Scoping Sessions –Draft EIS Terms of Reference – TUK 2010-10-29
File Number: 02/10-05-0037
Size: 485 KB
ENR GNWT Clarification to EIRB (Oct26’10) (2) – 2010-10-29
File Number: 02/10-05-0038
Size: 88 KB
IT HWY Proposed ToR Comments GoC 2010-10-29
File Number: 02/10-05-0040
Size: 833 KB
Registered Participant comments 2010-10-29
File Number: 02/10-05-0041
Size: 302 KB
TOR Registered Participant comments 2010-10-29
File Number: 02/10-05-0042
Size: 13 KB
Letter from Minister Duncan to EIRB Chair 2010-11-02
File Number: 02/10-05-0043
Size: 334 KB
Community Scoping Sessions – Draft EIS Terms of Reference – Inuvik Final (2) 2010-11-03
File Number: 02/10-05-0044
Community Scoping Sessions – Draft EIS Terms of Reference (2) 2010-11-03
File Number: 02/10-05-0045
FINAL EIS Terms of Reference 03Nov2010 – 2010-11-03
File Number: 02/10-05-0046
Size: 729 KB
Letter from INAC to EIRB 2010-11-22
File Number: 02/10-05-0048
Size: 41 KB
INAC_TERRAIN_ASSESSMENT_REPORT 2010-11-22
File Number: 02/10-05-0049
Size: 519 KB
File Number: 02/10-05-0050
Size: 4 MB
Request from developer to the EIRB to extend the deadline to draft EIS 2011-01-25
File Number: 02/10-05-0051
Size: 35 KB
EIRB response to the request to extend the deadline to the draft EIS 2011-01-31
File Number: 02/10-05-0052
Size: 69 KB
Developer reasons for request to extend the deadline to the draft EIS 2011-02-02
File Number: 02/10-05-0053
Size: 37 KB
Notice of deadline extension to the Draft EIS 2011-03-01
File Number: 02/10-05-0054
News Release – Final Agreement and Availability of participant funding 2011-03-04
File Number: 02/10-05-0055
Size: 42 KB
Agreement to Establish a Substituted panel for the Inuvik to Tuktoyaktuk Highway Project 2011-03-04
File Number: 02/10-05-0056
Size: 2 MB
Public Notice – Availability of Participant Funding
File Number: 02/10-05-0057
Request from Developer to the EIRB to extend the deadline to the draft EIS 2011-03-23
File Number: 02/10-05-0058
Size: 40 KB
Notice of Deadline Extension 2011-03-29
File Number: 02/10-05-0059
Size: 38 KB
Review Schedule FINAL Rev24Mar2011 2011-04-12
File Number: 02/10-05-0060
Size: 199 KB
Notice of Release of the draft EIS 2011-06-03
File Number: 02/10-05-0061
Size: 102 KB
Draft EIS 2011-06-07
File Number: 02/10-05-0067
Document: Appendix
Size: 22 MB
Draft EIS 01 2011-06-07
File Number: 02/10-05-0068
Document: Environmental Impact Statement
Draft EIS 02 2011-06-07
File Number: 02/10-05-0069
Size: 6 MB
Draft EIS 04 2011-06-07
File Number: 02/10-05-0071
Size: 9 MB
Draft EIS 05 2011-06-07
File Number: 02/10-05-0072
Size: 7 MB
Tuktoyaktuk – Inuvik Working Group comments on draft EIS 2011-06-27
File Number: 02/10-05-0073
Size: 56 KB
ILA Conformity Review 2011-06-27
File Number: 02/10-05-0074
Size: 25 KB
WMAC (NWT) comments on Draft EIS 2011-06-27
File Number: 02/10-05-0075
Size: 278 KB
GoC EIS Conformity Review Comments – 2011-06-27
File Number: 02/10-05-0076
Size: 1 MB
EIRB Conformity Statement 2011-07-15
File Number: 02/10-05-0078
Size: 137 KB
Cover letter to EIRB on Addendum 2011-08-29
File Number: 02/10-05-0079
Size: 68 KB
Developer response to EIRB Conformity Review 2011-08-29
File Number: 02/10-05-0080
Aboriginal Affairs and Northern Development Canada 2011-08-29
File Number: 02/10-05-0081
Environment Canada 2011-08-29
File Number: 02/10-05-0082
Health Canada -2011-08-29
File Number: 02/10-05-0083
Size: 202 KB
Inuvialuit Land Administration 2011-08-29
File Number: 02/10-05-0084
Size: 115 KB
Transport Canada 2011-08-29
File Number: 02/10-05-0085
Size: 120 KB
Tuktoyaktuk-Inuvik Working Group 2011-08-29
File Number: 02/10-05-0086
Size: 208 KB
Wildlife Management Advisory Council 2011-08-29
File Number: 02/10-05-0087
Fisheries and Oceans Canada 2011-08-29
File Number: 02/10-05-0088
Size: 336 KB
Developer response to TOR 2010-10-22
File Number: 02/10-05-0089
Size: 106 KB
ENR draft TOR comments (Oct 22 2010) 2010-10-22
File Number: 02/10-05-0090
Size: 183 KB
Appendix_A GNWT comments Draft EIS ToR 2010-10-22
File Number: 02/10-05-0091
Size: 96 KB
EIRB CONFORMITY STATEMENT AND BOARD DIRECTION REGARDING THE DRAFT ENVIRONMENTAL IMPACT STATEMENT 2011-10-14
File Number: 02/10-05-0092
EIRB Direction to the Developer Nov 2011 2011-11-09
File Number: 02/10-05-0093
Size: 85 KB
Developer letter to EIRB Nov 2011 Elimination of Alternative 2 (upland route) from consideration 2011-11-09
File Number: 02/10-05-0094
Size: 655 KB
Developer Response to EIRB Nov 18 2011 2011-11-18
File Number: 02/10-05-0095
Size: 8 MB
Revision to file 095-1 Developer response to 2b and 2c 2011-11-23
File Number: 02/10-05-0096
Revision to file 095-1 GNWT Social Programming 2011-11-23
File Number: 02/10-05-0097
Size: 606 KB
Legislative Assembly Vision and Priorities Nov 23, 2011 2011-11-23
File Number: 02/10-05-0098
Size: 290 KB
1. Letter to Developer 20 Dec 2011 re Technical Review 2011-12-20
File Number: 02/10-05-0099
Size: 135 KB
2. Information Request Process 2011-12-20
File Number: 02/10-05-0100
Size: 303 KB
3. IR Process flow chart
File Number: 02/10-05-0101
Size: 172 KB
4. Review Steps 2011-12-20
File Number: 02/10-05-0102
Size: 459 KB
5. Review Schedule revised 20 dec 2011 2011-12-20
File Number: 02/10-05-0103
Size: 213 KB
IR round 1 Issued to Developer 2012-01-16
File Number: 02/10-05-0104
Size: 637 KB
Letter to EIRB Jan 20 2012 2012-01-20
File Number: 02/10-05-0105
Size: 107 KB
Letter to Developer 24Jan2012 2012-01-24
File Number: 02/10-05-0106
Size: 361 KB
Letter to all Parties 2012-02-07
File Number: 02/10-05-0107
1. Response to Information requests EIRB jan 16 2012 2012-02-10
File Number: 02/10-05-0108
2. Attachment 1 Resumes 2012-02-10
File Number: 02/10-05-0109
3. Attachment 2 EGT Training Programs 2012-02-10
File Number: 02/10-05-0110
4. Attachment 3 HSE Manuals 2012-02-10
File Number: 02/10-05-0111
5. IR Number 29 33-37 and attachment to 55 2 – 2012-02-10
File Number: 02/10-05-0112
10 feb 2012 EIRB response letter to WMAC (NT) 2012-02-10
File Number: 02/10-05-0114
Size: 263 KB
IR Process Round 2 Notification
File Number: 02/10-05-0115
Size: 232 KB
07 Feb 2012 WMAC (NT) Letter to EIRB 2012-02-07
File Number: 02/10-05-0116
Size: 282 KB
1. ITH Final Fisheries Report 2012-02-15
File Number: 02/10-05-0117
Size: 898 KB
2. ITH Final Fisheries Report Appendix I – 2012-02-15
File Number: 02/10-05-0118
Size: 923 KB
3. ITH Final Fisheries Report Appendix II – 2012-02-15
File Number: 02/10-05-0119
Size: 112 KB
4. ITH Final Fisheries Report Appendix III – 2012-02-15
File Number: 02/10-05-0120
Size: 11 MB
HTC Tuk Letter to EIRB – 2012-02-21
File Number: 02/10-05-0121
EIRB Response to Tuk HTC – 2012-02-21
File Number: 02/10-05-0122
1.IRs to Developer R2 – 2012-03-19
File Number: 02/10-05-0123
Document: Public Notices
Size: 5 MB
2.AANDC IRs 2012-03-19
File Number: 02/10-05-0124
Size: 247 KB
3.BDHSSA IRs -2012-03-19
File Number: 02/10-05-0125
Size: 126 KB
4.CanNor IRs 2012-03-19
File Number: 02/10-05-0126
Size: 133 KB
5.DFO IRs -2012-03-19
File Number: 02/10-05-0127
Size: 412 KB
6.DOT IRs -2012-03-19
File Number: 02/10-05-0128
Size: 109 KB
7.EC IRs -2012-03-19
File Number: 02/10-05-0129
Size: 324 KB
8.ENR IRs 2012-03-19
File Number: 02/10-05-0130
Size: 544 KB
9.FJMC IRs 2012-03-19
File Number: 02/10-05-0131
Size: 413 KB
10.HC IRs -2012-03-19
File Number: 02/10-05-0132
Size: 129 KB
11.HOUSING CORP IRs -2012-03-19
File Number: 02/10-05-0133
Size: 166 KB
12.HSS IRs 2012-03-19
File Number: 02/10-05-0134
Size: 168 KB
13.GNWT Stats IRs -2012-03-19
File Number: 02/10-05-0135
Size: 227 KB
14.ITI IRs -2012-03-19
File Number: 02/10-05-0136
15.DOJ IRs -2012-03-19
File Number: 02/10-05-0137
Size: 171 KB
16.GNWT PWS IRs 2012-03-19
File Number: 02/10-05-0138
Size: 229 KB
17.IDC IRs 2012-03-19
File Number: 02/10-05-0139
Size: 132 KB
18.IGC IRs 201-03-19
File Number: 02/10-05-0140
19.ILA IRs 2012-03-19
File Number: 02/10-05-0141
20.IHTC IRs 2012-03-19
File Number: 02/10-05-0142
21.IRC IRs 202-03-19
File Number: 02/10-05-0143
Size: 323 KB
22.THTC IRs 2012-03-19
File Number: 02/10-05-0144
Size: 173 KB
23.WMAC NWT IRs 2012-03-19
File Number: 02/10-05-0145
Size: 331 KB
09Mar2012 EC Ltr to EIRB 2012-03-09
File Number: 02/10-05-0146
Document: Comments Received/Responses
Size: 727 KB
KAVIK-Stantec Terrain Evaluation Report 14mar2012 2012-03-19
File Number: 02/10-05-0147
KAVIK-Stantec Terrain Evaluation Report Surficial Mapbook 2012-03-19
File Number: 02/10-05-0148
24.IR to DEVELOPER 2012-03-20
File Number: 02/10-05-0149
Size: 375 KB
29Mar2012 Response Ltr to EC Ltr of 09Mar2012 2012-03-29
File Number: 02/10-05-0150
Size: 316 KB
28 March 2012 WMAC Submission to EIRB tech review of Inuvik Tuk hwy proposal 2012-04-02
File Number: 02/10-05-0151
Size: 543 KB
1. FJMC Response to EIRB IR Round 2 2012-04-03
File Number: 02/10-05-0152
2.HC response to IR 86 from EIRB March 2012 2012-04-03
File Number: 02/10-05-0153
Size: 55 KB
3.30 March 2012 WMAC responses to EIRB’s Rd 2 IRs for Inuvik Tuk hwy proposal 2012-04-03
File Number: 02/10-05-0154
Size: 628 KB
4.EIRB 02 10 05 – Tuk to Inuvik Highway – IR Round 2 EC Responses 2012-04-03
File Number: 02/10-05-0155
Size: 196 KB
5.DFO Responses to IRs_March2012 2012-04-03
File Number: 02/10-05-0156
6.EIRB Response IRC – IR#81 83 86 125 -2012-04-03
File Number: 02/10-05-0157
7.EIRB Response IDC – IR#81 2012-04-03
File Number: 02/10-05-0158
Size: 90 KB
8.EIRB Response ILA IR#79 2012-04-03
File Number: 02/10-05-0159
9.Response to Information Requests – EIRB – March 8 2012 2012-04-03
File Number: 02/10-05-0160
10.AANDC – response to EIRB IR Mar 27 2012 – 2012-04-05
File Number: 02/10-05-0161
11.YELLOWKN-#508418-v1-CANNOR_-_NPMO_-_Inuvik_Tuk_Road_CANNOR_IRs -2012-04-03
File Number: 02/10-05-0162
12.GNWT Round 2 IR Responses Invk – Tuk EA – Part 1 (2) – 2012-04-05
File Number: 02/10-05-0163
Size: 502 KB
13.IGC IR RESPONSE ROUND 2 -2012-04-05
File Number: 02/10-05-0164
Size: 116 KB
14.GNWT Round 2 IR Responses Invk – Tuk EA – Part 2 (2) – 2012-04-11
File Number: 02/10-05-0165
Size: 586 KB
KAVIK-STANTEC Preliminary Vegetation Report 23Apr2012pdf -2012-04-23
File Number: 02/10-05-0166
Size: 153 KB
ITH_Vegetation_18Apr2012 2012-04-23
File Number: 02/10-05-0167
Size: 20 KB
Response to Information Requests (114 and 117) – EIRB – March 8 2012 lr 2012-04-30
File Number: 02/10-05-0168
Round 2 IR responses ITH Part 3 caribou 11May12 (2) 2012-05-11
File Number: 02/10-05-0169
Round 2 IR responses ITH Part 4 Grizzly Bear 11May12 2012-05-11
File Number: 02/10-05-0170
Size: 231 KB
COSEWIC STATUS ASSESSMENT – Grizzly Bear -2012-05-23
File Number: 02/10-05-0171
Size: 206 KB
Directive to the Developer 2012-05-25
File Number: 02/10-05-0172
Size: 197 KB
24May2012 Ltr to EC regarding SARA Species Information 2012-05-25
File Number: 02/10-05-0173
Size: 118 KB
24May2012 Ltr to Inuvik HTC FINAL 2012-05-25
File Number: 02/10-05-0174
24May2012 Ltr to Tuk HTC 2012-05-25
File Number: 02/10-05-0175
EIRB Letter 2012-05-29
File Number: 02/10-05-0176
Size: 650 KB
May 31 EIRB Response to Reasons (2) 2012-05-31
File Number: 02/10-05-0177
Update to IR 28 1 -2012-06-05
File Number: 02/10-05-0178
Size: 48 KB
EIRB June 7 on Census 2012-06-12
File Number: 02/10-05-0179
GNWT Letter to DOT RE EIRB Directive 2012-06-12
File Number: 02/10-05-0180
Size: 164 KB
June 8 EIRB IRC response 2012-06-12
File Number: 02/10-05-0181
Jim Steven – DOT – Inuvik Tuk Highway EIRB 2012-06-12
File Number: 02/10-05-0182
Size: 187 KB
Response to Information Requests – EIRB May 25 2012
File Number: 02/10-05-0183
James_Gordo_Tech Paper_TUK_Highway_Final_2012 (2) 2012-06-13
File Number: 02/10-05-0184
18June2012 Note to File 2012-06-18
File Number: 02/10-05-0185
Size: 511 KB
EIRB 02 10 05 Tuk to Inuvik Highway EC Letter Response to EIRB – June 15 2012 2012-06-20
File Number: 02/10-05-0186
1.KAVIK-STANTEC_ITH_Preliminary Wildlife Habitat Report 1Jun2012 2012-06-20
File Number: 02/10-05-0187
Size: 122 KB
2.123510689_026_50k_PEFA_Atlas_Combined – 2012-06-20
File Number: 02/10-05-0188
3.123510689_027_50k_RUBL_Atlas_Combined -2012-06-20
File Number: 02/10-05-0189
4.123510689_028_50k_SEOW_Atlas_Combined 2012-06-20
File Number: 02/10-05-0190
5.123510689_029_50k_HOGR_Atlas_Combined -2012-06-20
File Number: 02/10-05-0191
6.123510689_030_50k_Waterbird_Combined 2012-06-20
File Number: 02/10-05-0192
Environmental Impact Review Board – Developer’s Request for Ruling 2012-06-20
File Number: 02/10-05-0193
29 June WMAC response to EIRB request for ruling (2) 2012-06-29
File Number: 02/10-05-0194
Size: 273 KB
Government of Canada Response to RfR 2012-06-29
File Number: 02/10-05-0195
ITH- Response to request for ruling –v2 2012-07-05
File Number: 02/10-05-0196
Letter – EIRB – TK-reports_july 2012 2012-07-05
File Number: 02/10-05-0197
Summary Existing TK for Inuvik to Tuk Highway –Final_May2012 (2) 2012-07-05
File Number: 02/10-05-0198
ITH – TK-TLU Workshops final report July_2012 2012-07-05
File Number: 02/10-05-0199
EIRB Staff and Developer June 15 2012 meeting minutes 2012-07-13
File Number: 02/10-05-0200
Size: 28 KB
EIRB Decision and Reasons in Response to Developer’s Request for Ruling 2012-07-16
File Number: 02/10-05-0201
July 17 Thanks to EIRB and Questions 2012-07-17
File Number: 02/10-05-0202
YELLOWKN-#525123-v1-CANNOR_-_NPMO_-_inuvik_to_tuk_road_-_letter_to_gwichin_-_FINAL_-_July_2012 – 2012-07-23
File Number: 02/10-05-0203
Size: 47 KB
YELLOWKN-#525120-v1-CANNOR_-_NPMO_-_INUVIK_TO_TUK_ROAD_-_LETTER_TO_INUVIALUIT_-_FINAL_-_JULY_19__201 – 2012-07-23
File Number: 02/10-05-0204
Size: 45 KB
Letter from IRC to EIRB
File Number: 02/10-05-0205
Size: 54 KB
EIRB 0210-05 – Note to File – EC DOT Meeting Report June 13 2012 – EC Submission -2012-07-23
File Number: 02/10-05-0206
Size: 870 KB
02 Aug 2012 Technical Teleconference Information (2) 2012-07-31
File Number: 02/10-05-0207
Technical Sessions Directive 2012-07-31
File Number: 02/10-05-0208
Size: 212 KB
Technical Teleconference EIRB Direction to the Developer 2012-07-31
File Number: 02/10-05-0209
Size: 277 KB
Inuvik to Tuktoyaktuk Highway Project Review Comments for 02-Aug 2012 Teleconference 2012-08-01
File Number: 02/10-05-0210
Size: 144 KB
NRCan IR #141 jk 2012-08-01
File Number: 02/10-05-0211
KAVIK-STANTEC Reports of Borrow Source Geotechnical Investigations 2012-08-08
File Number: 02/10-05-0212
Technical Session Topics of Interest – EC – letter to EIRB Aug 2012 -2012-08-09
File Number: 02/10-05-0213
Size: 395 KB
Letter to EIRB re request by developer -2012-08-03
File Number: 02/10-05-0214
Size: 143 KB
Technical Submissions EIRB directive 2012-08-10
File Number: 02/10-05-0215
Size: 405 KB
Public Hearing Directive 2012-08-10
File Number: 02/10-05-0216
10Aug2012 Panel Appointment Announcement 2012-08-10
File Number: 02/10-05-0217
DFO_techsession_questions_Aug2012_Final 2012-08-20
File Number: 02/10-05-0218
Size: 30 KB
NRCan QuestionsTUKTechnicalSession 22-23Aug12FV (jk) 2012-08-20
File Number: 02/10-05-0219
TC Technical Sessions Topic Questions Tuk Highway August 2012 2012-08-20
File Number: 02/10-05-0220
Size: 940 KB
TS Agenda Draft 2012-08-20
File Number: 02/10-05-0221
Size: 75 KB
EIRB description of Technical Sessions Process 2012-08-20
File Number: 02/10-05-0222
Size: 73 KB
WMAC Tech Session Issues 2012-08-20
File Number: 02/10-05-0223
Size: 174 KB
1. KAVIK-Stantec Final Wildlife report – cover – 2012-08-20
File Number: 02/10-05-0224
2.KAVIk-STANTEC_ITH_Wildlife Report 17Aug2012_final 2012-08-20
File Number: 02/10-05-0225
3. Wildlife Report Appendix A_HOGR_low_res 2012-08-20
File Number: 02/10-05-0226
4. Wildlife Report Appendix B waterbird low res 2012-08-20
File Number: 02/10-05-0227
5. Wildlife Report Appendix C_PEFA_LOW_RES 2012-08-20
File Number: 02/10-05-0228
6. Wildlife Report Appendix D SEOW_low_res 2012-08-20
File Number: 02/10-05-0229
7. Wildlife Report Appendix E_RUBL_low_res 2012-08-20
File Number: 02/10-05-0230
8. Wildlife Report Appendix F_grizzly_den low_res 2012-08-20
File Number: 02/10-05-0231
KAVIK-Stantec FINAL Borrow source investigations report cover (2) 2012-08-20
File Number: 02/10-05-0232
Response to Directives –EIRB May 25 2012 -2012-08-20
File Number: 02/10-05-0233
August 2012 Presentation – Combined Presentation 2012-08-22
File Number: 02/10-05-0234
TECH SESSION re INUVIK TO TUK HIGHWAY 08-22-2012 2012-08-22
File Number: 02/10-05-0235
TECH SESSION re INUVIK TO TUK HIGHWAY 08-23-2012 2012-08-27
File Number: 02/10-05-0236
27Aug2012 Request Developer Experts 2012-08-27
File Number: 02/10-05-0237
Size: 389 KB
27Aug2012 Clarification ltr to ENR 2012-08-27
File Number: 02/10-05-0238
Cut-off date Directive 2012-08-27
File Number: 02/10-05-0239
Notice of Submission Deadline Extension 2012-08-27
File Number: 02/10-05-0240
Size: 230 KB
PH Agenda Inuvik 2012-08-27
File Number: 02/10-05-0241
Size: 84 KB
PH Agenda Tuktoyaktuk 2012-08-27
File Number: 02/10-05-0242
Size: 36 KB
PHC Agenda 2012-08-27
File Number: 02/10-05-0243
Size: 79 KB
Additonal Information – Harvested Plants 2012-09-04
File Number: 02/10-05-0244
Supplemental Wildlife maps and metrics 28Aug2012 2012-07-28
File Number: 02/10-05-0245
123510689_029_50k_HOGR_SUPPLEMENTAL – 2010-08-28
File Number: 02/10-05-0246
123510689_061_50k_Grizzly_SUPPLEMENTAL 2012-08-28
File Number: 02/10-05-0247
KAVIK-Stantec Hydrotechnical Interim Report 27Aug2012 cover 2012-08-24
File Number: 02/10-05-0248
Inuvialuit Land Administration to IHTC and EIRB August 30 2012 -2012-08-30
File Number: 02/10-05-0249
Size: 258 KB
IMG Watercourse Crossing Master Table 1 TechnicalAug31 2012-09-04
File Number: 02/10-05-0250
Size: 61 KB
IMG Watercourse Crossing Master Table 2Aug. 31 – Biophysical 2012-09-04
File Number: 02/10-05-0251
Developer Response to Tk Workshop Comments -2012-09-04
File Number: 02/10-05-0252
ITH August 28 2012 Meeting DOT and ILA Commission aug 31 (2) 2012-09-04
File Number: 02/10-05-0253
Commitments Table updated August 31 2012 2012-09-04
File Number: 02/10-05-0254
Response to Technical Sessions IRs Material Sources 2012-09-04
File Number: 02/10-05-0255
123510689_027_50k_RUBL_SUPPLEMENTAL 2012-09-06
File Number: 02/10-05-0256
123510689_028_50k_SEOW_SUPPLEMENTAL 2012-09-06
File Number: 02/10-05-0257
GNWT hearing attendance ITH 2012-09-06
File Number: 02/10-05-0258
1. KAVIK-Stantec Veg terrain report –cover- 2012-09-04
File Number: 02/10-05-0259
2. KAVIK-STANTEC_ITH_Vegetation_Report_FINAL_31Aug2012 – 2012-09-04
File Number: 02/10-05-0260
123510689_046_10k_Vegetation_Overview_atlas_COMBINED_1 2012-09-04
File Number: 02/10-05-0261
Vegetation_Overview_Atlas_COMBINED_2 2012-09-04
File Number: 02/10-05-0262
123510689_046_10k_Vegetation_Overview_atlas_COMBINED_3 2012-09-04
File Number: 02/10-05-0263
Surficial_mapbook_20120830_1 2012-09-04
File Number: 02/10-05-0264
Surficial_mapbook_20120830_2 2012-09-04
File Number: 02/10-05-0265
Size: 10 MB
Surficial_mapbook_20120830_3 2012-09-04
File Number: 02/10-05-0266
ITH_Terrain_Report_FINAL_August_31_2012 2012-09-04
File Number: 02/10-05-0268
Technical Memo Kavik-Stantec Sept 4 2012
File Number: 02/10-05-0269
Response to Directive 6 EIRB May 25 2012 2012-09-04
File Number: 02/10-05-0270
Size: 322 KB
Supplemental Cumulative Effects Documentation LR 2012-09-04
File Number: 02/10-05-0271
Granular Materials References Aug 24 2012-09-04
File Number: 02/10-05-0272
Size: 259 KB
Affected Areas 4Sept12_final 2012-09-04
File Number: 02/10-05-0273
1. INFC Submission Public hearings 2012-09-10
File Number: 02/10-05-0274
Size: 140 KB
2.TCC Inuvik to Tuktoyaktuk Highway presentation to the EIRB hearings 2012-09-10
File Number: 02/10-05-0275
Size: 262 KB
3. WMAC (NWT) Tech Submission 2012-09-07
File Number: 02/10-05-0276
4.PC Submission to EIRB re Proposed Inuvik-Tuk highway Spet 6 2012 2012-09-06
File Number: 02/10-05-0277
5.EC Draft Technical Submission 2012-09-10
File Number: 02/10-05-0278
6.AANDC Tech Submission Inuvik Tuk Highway final 2012-09-10
File Number: 02/10-05-0279
7.NRCan draft tech report I-T highway sept 7 (final) 2012-09-07
File Number: 02/10-05-0280
8.DFO Draft technical submission ITH_FINAL 2012-09-10
File Number: 02/10-05-0281
10Sept2012 IRC LETTER_201209101103 (2) 2012-09-10
File Number: 02/10-05-0282
September 2012 Revised Response to Technical Sessions IRs – Material Sources 2012-09-11
File Number: 02/10-05-0283
FINAL HC Submission to EIRB on Tuk to Inuvik September 7 2012 2012-09-07
File Number: 02/10-05-0284
Transport Canada for EIRB 02 10-05 Tuk Road Tech Submission and Power Point for Public Hearings Sept – 2012-09-07
File Number: 02/10-05-0285
WMAC ITH Public Meet PP 2012-09-12
File Number: 02/10-05-0286
Size: 451 KB
Developer Response to Technical Submissions – September 13 2012 – 2012-09-13
File Number: 02/10-05-0287
Size: 563 KB
PH Agenda Inuvik -2012-09-13
File Number: 02/10-05-0288
Size: 92 KB
PH Agenda Tuktoyaktuk 2012-09-13
File Number: 02/10-05-0289
Size: 81 KB
PCA power point for EIRB hearing Sept 2012 Final -2012-09-14
File Number: 02/10-05-0290
File Number: 02/10-05-0291
AANDC Inuvik – Tuk EIRB Hearings – Inuvik 2012 -2012-09-14
File Number: 02/10-05-0292
Size: 343 KB
EIRB 02 10 05 Tuk to Inuvik Highway – Public Hearing Presentation – EC – 2012-09-14
File Number: 02/10-05-0293
Developer Display_Panels 2012-09-14
File Number: 02/10-05-0294
Developer PPT Review Panel ITH – 12-09-14 part 1-lr 2012-09-14
File Number: 02/10-05-0295
Developer PPT Review Panel ITH – 12-09-14 part 2-lr 2012-09-14
File Number: 02/10-05-0296
DFO ITH Presentation Public Hearings 2012-09-16
File Number: 02/10-05-0297
Size: 649 KB
Day 1 REVIEW – INUVIK TO TUK PUBLIC HEARING 09-18-2012 -2012-09-18
File Number: 02/10-05-0298
DFO hearing undertaking_Sept 20, 2012 – 2012-09-20
File Number: 02/10-05-0299
EIRB INUVIK TO TUK HEARING 09-19-2012 -2012-09-20
File Number: 02/10-05-0300
PH Agenda Tuktoyaktuk v2 2012-09-20
File Number: 02/10-05-0301
EIRB – INUVIK TO TUK HEARING 09-24-2012 2012-09-24
File Number: 02/10-05-0302
EIRB- INUVIK TO TUK PUBLIC HEARING 09-25-2012 2012-09-25
File Number: 02/10-05-0303
Directive -2012-09-28
File Number: 02/10-05-0304
Reasons for Decision 2012-09-28
File Number: 02/10-05-0305
Size: 536 KB
FJMC letter on Tuk-Inuvik hwy Public hearing in Inuvik Sept 2012- 2012-10-01
File Number: 02/10-05-0306
Size: 327 KB
Commitments Table – updated September 28 2012 2012-10-01
File Number: 02/10-05-0307
Size: 319 KB
ITH undertaking ENR – ZOI final Sept27_12 2012-10-01
File Number: 02/10-05-0309
NOTES FROM MEETING IN TUKTOYAKTUK (SEPTEMBER 20, 2012) 2012-10-01
File Number: 02/10-05-0310
Erratum in response to information requests 2012-10-01
File Number: 02/10-05-0311
12Sept2012 Erratum in Supplemental Cumulative Effects Analysis Ir 2012-10-01
File Number: 02/10-05-0312
28Sept2012 ITH Supplemental Cumulative Effects Analysis 2012-10-01
File Number: 02/10-05-0313
KAVIK-Stantec archaeological investigations report 11Sept2012 2012-10-01
File Number: 02/10-05-0314
ITH planprofile on FTP 2012-10-02
File Number: 02/10-05-0315
ITH routing map on FTP 2012-10-02
File Number: 02/10-05-0316
Draft for Discussion – WEMP Inuvik to Tuktoyaktuk Highway October 4 2012 – 2012-10-04
File Number: 02/10-05-0318
Size: 730 KB
KAVIK-Stantec hydrotechnical investigations report –cover- 2012-10-05
File Number: 02/10-05-0319
Size: 176 KB
Meeting summary IGC-DOT 28Sept2012 2012-10-05
File Number: 02/10-05-0320
Meeting summary FJMC-DFO-DOT 28Sept2012 -2012-10-05
File Number: 02/10-05-0321
Size: 119 KB
Inuvik to Tuk Road – GoC response – revised directive – Oct 5 2012 2012-10-05
File Number: 02/10-05-0322
Final Technical Memo Oct4 ITH 2012 Bathymetry (2) 2012-10-05
File Number: 02/10-05-0323
Developer –PreliminaryDraftWPP_5Oct2012 -2012-10-05
File Number: 02/10-05-0324
Size: 432 KB
PWNHC information request_ITH_Oct 5 -2012-10-05
File Number: 02/10-05-0325
Size: 111 KB
FJMC follow-up letter to EIRB Oct 2012 – 2012-10-04
File Number: 02/10-05-0326
Size: 215 KB
Meeting record WMAC-DOT 5Oct2012 -201-10-05
File Number: 02/10-05-0327
New IRs WMAC (NWT) -2012-10-15
File Number: 02/10-05-0328
Fisheries and Oceans Canada Information Request Oct 15 2012 – Inuvik –Tuktoyaktuk Highway – 2012-10-15
File Number: 02/10-05-0329
4.IR Developer Commitments 2012-10-16
File Number: 02/10-05-0330
Letter to go with final round IRs (2) 2012-10-16
File Number: 02/10-05-0331
Size: 280 KB
NPMO ltr re Dist of Panel report (C0279179) (2) 2012-10-22
File Number: 02/10-05-0333
Response to information Requests – EIRB – Oct 15 2012 – 2012-10-22
File Number: 02/10-05-0334
Size: 603 KB
EIRB FTP Advisory 2012-10-23
File Number: 02/10-05-0335
Tuk Highway final submission Oct 2012 (2) 2012-10-29
File Number: 02/10-05-0336
Size: 340 KB
INFC final submission 2012-10-29
File Number: 02/10-05-0337
Size: 217 KB
WMAC Final Technical Submission 2012-10-29
File Number: 02/10-05-0338
AANDC Final technical submission 2012-10-29
File Number: 02/10-05-0339
EC cover letter for final technical submission 2012-10-29
File Number: 02/10-05-0340
EC final technical submission 2012-10-29
File Number: 02/10-05-0341
Size: 382 KB
NRCan Final Technical Submission 2012-10-29
File Number: 02/10-05-0342
EIRB contact notification 2012-10-30
File Number: 02/10-05-0343
DFO Cvr Ltr final technical submission 2012-10-29
File Number: 02/10-05-0344
Size: 23 KB
DFO final technical submission 2012-10-29
File Number: 02/10-05-0345
Size: 598 KB
Developer Final Technical Submission 2012-11-05
File Number: 02/10-05-0346
ENR role in ITH project 2012-09-07
File Number: 02/10-05-0347
Letter to Ministers 2013-01-25
File Number: 02/10-05-0348
Size: 31 KB
Developers letter 2013-01-25
File Number: 02/10-05-0349
Matthew Spence letter 2013-01-25
File Number: 02/10-05-0350
Letter to parties 2013-01-25
File Number: 02/10-05-0351
News release final 2013-01-25
File Number: 02/10-05-0352
Final Panel report 2013-01-25
File Number: 02/10-05-0353
Size: 13 MB
The Honorable Denis Lebel letter 2013-02-22
File Number: 02/10-05-0354
Government response to EIR panel report 2013-04-05
File Number: 02/10-05-0355
EIR panel final report – French 2013-05-08
File Number: 02/10-05-0356
Size: 1 KB